Amtico Access Technical Specification Date of issue: 26th February 2015 AREAS OF USE Office, business, hospitality, and areas requiring flooring that is temporary or can be easily removed. INSTALLATION Installation must be carried out in accordance with the requirements of the relevant national standard and the Amtico Products Technical Manual – the latest information is available at www.amtico.com. The surface must be flat, smooth, dry and fit for purpose. Levelling compounds should be used as recommended. Tiles and subfloor must be allowed to stabilize to a constant temperature between 18° and 27°C for a period of 24 hours prior to, during and 24 hours after installation. Underfloor heating must be switched off for 48 hours before, during and 48 hours after installation. The tiles should be stored flat. Amtico Tackifier is recommended for installing tiles generally; however, in areas subject to large changes in temperature or where underfloor heating is installed, then tiles should be permanently bonded. The completed installation should be rolled with a 45 kg roller. MAINTENANCE Maintenance should be carried out in accordance with the recommendations of the Amtico Products Technical Manual – the latest information is available at www.amtico.com. The urethane surface treatment facilitates the removal of scuff marks. Cleaning products and entrance matting designed for use with Amtico products are available from Amtico International. Maintenance should involve simple dust mopping, wet mopping, spray cleaning or scrubber-drying with a neutral detergent. The application of a floor dressing is not necessary, although this can be carried out to provide additional protection if desired. It is recommended that tiles should be permanently bonded if a scrubber-dryer is used and/or when floors are dressed. Page 2 of 2
Download PDF file
Build your own flipbook